What steel erection actually involves, stage by stage
Erection is the visible part of a longer sequence. Knowing the stages makes it much easier to see where a programme is going to slip.
Blog
Practical notes on structural steel erection and chiller maintenance in the UAE, written by the AL NIMRA team.
Erection is the visible part of a longer sequence. Knowing the stages makes it much easier to see where a programme is going to slip.
Quarterly is the interval most contracts inherit. It comes from temperate climates, and Gulf dust load is the reason it often is not enough.
Most maintenance disputes are not about the work done. They are about what the scope was silent on.
A checklist worth working through before the first delivery, because every item on it stops the crane if it is missed.
A scope you can hold a contractor to, written as a specification to demand rather than a service to sell.
Three quotations with three different totals are usually three different scopes. Normalising them is the actual work.
A few millimetres at the base becomes a much larger problem at the top of the column. Here is how that happens.
The two standard contract types priced very differently, and a straightforward way to decide which one your plant justifies.
Treated as paperwork they are useless. Treated as planning they prevent most of what goes wrong.