Common causes of delay on a steel package
The same handful of items account for most lost time, and nearly all of them are decided before erection starts.
Blog
Practical notes on structural steel erection and chiller maintenance in the UAE, written by the AL NIMRA team.
The same handful of items account for most lost time, and nearly all of them are decided before erection starts.
A water-cooled chiller is only as good as the loop behind it, and that loop needs attention the chiller does not.
A short list that separates a contractor who has thought about your job from one who has only priced it.
Tell us about the project and we will come back to you.
Enquiry